Water Woes Ended, Insulation Project Begins

The vampire taps have both been replaced and the line that will be connected for the ice maker on the new refrigerator has been run up to it’s location, so it will be ready and in place for the delivery in a few days. With any luck this will be the last time we need to call out a plumber for a long time.

Moving on to the next pre-move in project… Chris and I started adding insulation in the attic today. I had noticed during the inspection that, while there was some insulation in the attic, the amount of insulation for the R value was not going to be adequate. Considering the house was built in 1967 when energy costs were lower, and we bought it from the original owner, I am not too surprised by the need for more insulation. I wanted to make sure this was one of the first projects we did before moving in because the attic access is inside what will be Kylie’s closet. As such we didn’t want to have to cover everything in her room in plastic and take everything out of her closet in order to move the insulation into the attic crawl space. Based on the estimation of the R value of what was already up there and combining that with what we added, we estimate that the attic should now have an R value of around 42. The suggested value for this area is between 38 and 49, so this should be good moving forward. Unfortunately we were not able to complete this project today though, and will need to finish it up another time.